Vinyl Siding Sealing Gap At Bottom Of Starter Strip

This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Vinyl siding sealing gap at bottom of starter strip. Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house. This would 100 seal up theair leaks and cover all the gaps where critters can get in. Below the top of the foundation but the lower the vinyl siding is installed the better. If it s 3 4 or more i d concider removing the bottom row of siding and starter strip and install a piece of 1 x 6 vinyl lumber then a piece of z moulding then replace the starter strip with j moulding reinstall the siding.
Holes occur over time when seals crack around plumbing fixtures on your siding allowing mice entrance into your home. Gap at the top where the post will meet the eaves. This is where the new siding will begin. It protects the sheathing from rain snow and pests.
Inexpensive and simple to do sealing your siding only requires a little time to locate the cracks. The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in. Cut the post long enough to extend past the bottom of the starter strip by 3 4 in. Find vinyl siding starter strips at lowe s today.
Position the outside corner post to allow 1 4 in.